Bellvue, CO
City of Greeley
Water
Construction Manager at Risk
Provide personnel and equipment to assist in design completion, and construction of temporary and permanent ventilation system at the Seaman Tunnel. Temporary system will consist of 11,000 cfm fan (unit will be powered by a temporary generator), fabric duct suspended from the existing pipe supports. The permanent system will consist of a 10,000 cfm fan (240 volt, single phae), stainless steel duct installed in the existing pipe supports.
Total Contract Amount
$120,567
Percent with Own Forces
84%
Year Completed
2017