Milton Seaman Outlet Rehab

< BACK TO ALL PORTFOLIOS

Project Overview

LOCATION:

Bellvue, CO

CLIENT:

City of Greeley

CATEGORY:

Water

CONTRACT MODEL:

Construction Manager at Risk

The Full Story

Provide personnel and equipment to assist in design completion, and construction of temporary and permanent ventilation system at the Seaman Tunnel. Temporary system will consist of 11,000 cfm fan (unit will be powered by a temporary generator), fabric duct suspended from the existing pipe supports. The permanent system will consist of a 10,000 cfm fan (240 volt, single phae), stainless steel duct installed in the existing pipe supports.

By The Numbers

Total Contract Amount

$120,567

Percent with Own Forces

84%

Year Completed

2017