Milliken, CO
Town of Milliken
Wastewater
Design/Build
This new facility included an Aero-Mod treatment system, grit removal, dewatering/blower building, ultra-violet disinfection, laboratory, and upgrades to an existing headworks. Through innovations and collaboration by the project team, Hydro/JHC designed and constructed a 0.7 MGD facility within the Town’s original 0.5 MGD budget. This project provided additional infrastructure to accommodate a future Aero-Mod structure and allow the plant capacity to eventually increase to 1.4 MGD.
Total contract amount
$5,224,038
Percent with own forces
76%
Year Completed
2006