Windsor, CO
GLH Construction, Inc.
Wastewater
Design/Bid/Build
Constructed new wastewater lift station including stick frame building with brick veneer and metal roof, wet well vaults, electrical, HVAC, instrumentation, and controls. Also, included excavation utilizing drilled dewatering wells, submersible pump, piping and value install, and backup generator housed in building.
Total contract amount
$926,179
Percent with own forces
62%
Year Completed
2017