Greeley, CO
City of Greeley
Wastewater
Construction Manager at Risk
Demo existing pumps and PVDF piping, core six-inch hole in concrete tank wall and install new PVC piping with double link seal through the wall. Install new pumps, PVC, and PVDF piping for new pump configuration.
Total Contract Amount
$19,680
Percent with Own Forces
100%
Year Completed
2017