Fort Collins Water Treatment Facility Chond

< BACK TO ALL PORTFOLIOS

Project Overview

LOCATION:

Fort Collins, CO

CLIENT:

City of Fort Collins

CATEGORY:

Water

CONTRACT MODEL:

Alternative Product Delivery System

The Full Story

Design assistance, conduct investigative potholing and construct a concrete structure with bar screen, stairs and handrail, concrete cutoff wall/weir with slide gate and permanent underground piping connection to a decant drainage pipeline near the decant pond at the Water Treatment Facility – for pump connection to drain finished water reservoirs to decant pond and drainage piping.

By The Numbers

Total Contract Amount

$185,495

Percent with Own Forces

85%

Year Completed

2018