Fort Collins, CO
City of Fort Collins
Water
Alternative Product Delivery System
Design assistance, conduct investigative potholing and construct a concrete structure with bar screen, stairs and handrail, concrete cutoff wall/weir with slide gate and permanent underground piping connection to a decant drainage pipeline near the decant pond at the Water Treatment Facility – for pump connection to drain finished water reservoirs to decant pond and drainage piping.
Total Contract Amount
$185,495
Percent with Own Forces
85%
Year Completed
2018