Fort Collins, CO
City of Fort Collins
Wastewater
Alternative Product Delivery System
Demolition and removal of existing centrifuge feed pumps, grinders, and associated piping. Installation of three Boerger In-Line grinders. Installation of two flowmeters, five static mixers, two MCC sections on MCC 1207. Installation of conduit for power and control of equipment and instruments. Installation of valves, check valves, piping and fittings to conform to new pumping arrangement. Complete start-up and testing and commissioning.
Total contract amount
$393,238
Percent with own forces
75%
Year Completed
2014