Casper, WY
City of Casper
Wastewater
Design/Bid/Build
Demolished and replaced existing digester lid at wastewater treatment plant. Replacement lid was 65 feet in diameter. This Envirodyne floating lid required welding, coatings, and precast ballast blocks. Project also included various piping modifications.
Total contract amount
$1,087,194
Percent with own forces
70%
Year completed
2016